Scientific paper ID 2439 : 2023/3
COMMUNICATION AND TRAIN CONTROL SYSTEMS FOR THE EXTENSION OF THE 3RD LINE OF THE SOFIA METRO ALONG VAZOV BOULEVARD
Svetoslav Tomov, Emiliya Dimitrova The project for the extension of Line 3 of the metro in Sofia in the ”Hadji Dimitar” - ”Levski” section is part of a general plan designed to ensure sustainable transport connectivity of the main directions in the capital through the implementation of safe, fast and ecological urban mass transport. It s a 3 km long tunnel section and 3 metro stations.
This report considers the dedicated position for control and safety systems as: Communication Based Train Control (CBTC), Transport Communication System, Integrated Radio Communication System, SCADA System for power supply, Platform Screen Doors System. The estimated benefits after the implementation of the project are increased number of passengers traveling by metro while maintaining the safety, comfort and convenience, guaranteed maximum travel speed of 80 km/h without being affected by traffic and atmospher conditions, reduction of harmful gases - fine dust particles, lead aerosols, etc. in the city and the region. Система за телекомуникационно управление на влаковото движение (CBTC - Communication Based Train Control) влаков контрол SCADA Inspiro метро транспорт.CBTC - Communication Based Train Control train control SCADA Inspiro metro transport.Svetoslav Tomov Emiliya Dimitrova BIBLIOGRAPHY [1] Statev. S „Proekt za razshirenie na Liniya 3 na metroto v Sofiya, uchastak „MS” Hadzhi Dimitar” - zh.k. Levski“ i uchastak „ul. Shipka - kv. Geo Milev -zhk. Slatina - Zala Arena armeets/Teh.park Sofiya - bul. Tsarigradsko shose“ ( [1] Статев. С „Проект за разширение на Линия 3 на метрото в София, участък „МС” Хаджи Димитър” - ж.к. Левски“ и участък „ул. Шипка - кв. Гео Милев -жк. Слатина - Зала Арена армеец/Тех.парк София - бул. Цариградско шосе“ ) [2] Nikolov N., „VISOKOTEHNOLOGIChNI SISTEMI ZA KONTROL I UPRAVLENIE NA VLAKOVOTO DVIZhENIE NA LINIYa 3 NA SOFIYSKOTO METRO “, Nauchno-tehnicheski sayuz po minno delo, geologiya i metalurgiya. Sofiya, ISBN 978-619-90939-9-3, 2023. str. 176-183. ( [2] Николов Н., „ВИСОКОТЕХНОЛОГИЧНИ СИСТЕМИ ЗА КОНТРОЛ И УПРАВЛЕНИЕ НА ВЛАКОВОТО ДВИЖЕНИЕ НА ЛИНИЯ 3 НА СОФИЙСКОТО МЕТРО “, Научно-технически съюз по минно дело, геология и металургия. София, ISBN 978-619-90939-9-3, 2023. стр. 176-183. ) [3] Tomov S., Domenil F., “ TRAINGUARD MT – INOVATIVNA SISTEMA ZA AVTOMATIChEN VLAKOV KONTROL ZA LINIYa 3 NA SOFIYSKIYa METROPOLITEN“, Nauchno-tehnicheski sayuz po minno delo, geologiya i metalurgiya. Sofiya, ISBN 978-619-90939-9-3, 2023. str. 159-167. ( [3] Томов С., Доменил Ф., “ TRAINGUARD MT – ИНОВАТИВНА СИСТЕМА ЗА АВТОМАТИЧЕН ВЛАКОВ КОНТРОЛ ЗА ЛИНИЯ 3 НА СОФИЙСКИЯ МЕТРОПОЛИТЕН“, Научно-технически съюз по минно дело, геология и металургия. София, ISBN 978-619-90939-9-3, 2023. стр. 159-167. ) [4] Dimitrova E., Tomov S., Algorithm for Positioning of Metro Trains under Communications-Based Train Control, 12th Electrical Engineering Faculty Conference BulEF 2020 (IEEE Conference), IEEE Xplore Digital Library, 2021, ISBN: 978-1-7281-9439-4, IEEE Catalog Number CFP20BUL-ART, Scopus DOI: 10.1109/BulEF51036.2020.9326061 https://ieeexplore.ieee.org/document/932606... [5] Deshev S., Angelov. S, Rankl, T., INSPIRO-INTELIGENTNI REShENIYa NA PODVIZhNIYa SASTAV NA LINIYa 3 NA SOFIYSKIYa METROPOLITEN“, Nauchno-tehnicheski sayuz po minno delo, geologiya i metalurgiya. Sofiya, ISBN 978-619-90939-9-3, 2023. str. 201-207. ( [5] Дешев С., Ангелов. С, Ранкл, Т., INSPIRO-ИНТЕЛИГЕНТНИ РЕШЕНИЯ НА ПОДВИЖНИЯ СЪСТАВ НА ЛИНИЯ 3 НА СОФИЙСКИЯ МЕТРОПОЛИТЕН“, Научно-технически съюз по минно дело, геология и металургия. София, ISBN 978-619-90939-9-3, 2023. стр. 201-207. ) |