Scientific paper ID 1231 : 2015/3
“TYPICAL DESIGN SOLUTIONS IN THE TRANSITIONAL AREAS OF THE SUPERSTRUCTURE OF THE TRACK FROM THE BALLAST TO THE NON-BALLAST DESIGNS”

Kosta Petrov Kostov

In the report shows the transitions occurring in the superstructure of the track when changing from one construction monolithic track to another. Made analysis of the practice applied in different constructive solutions in the transitional areas of the superstructure of the track.


железен път преход преходна област конструкция монолитен железен пътrailroad transition transitional area construction solid trackKosta Petrov Kostov

BIBLIOGRAPHY

[1] Darr E., Fiebig W. “Feste Fahrbahn – Konstruktion und Bauarten fur Eisenbahn und Strassenbahn”, VDEI, Germany, 2006

[2] Anforderungskatalog zum Bau der Festen Fahrbahn, 2002

[3] DP „NKZhI”, „Instruktsiya za tekushto poddarzhane na bezbalastov zhelezen pat s relsi tip 60E1 i Y-traversi varhu asfaltova osnova v tunel №3, 2010
( [3] ДП „НКЖИ”, „Инструкция за текущо поддържане на безбаластов железен път с релси тип 60Е1 и Y-траверси върху асфалтова основа в тунел №3, 2010 )

 

 

 